No Image

Greenlab Diamonds Factory / Design Work Group

March 1, 2024 Pilar Caballero 0

Greenlab Diamond Factory marks a pioneering venture in the heart of India, introducing the first-of-its-kind lab-grown diamond manufacturing facility. Spanning 95000 sq ft, the innovative building seamlessly integrates production areas and office spaces across four thoughtfully designed stories. Breaking away from the conventional industrial aesthetic, the Greenlab Diamond Factory boasts a captivating facade featuring exposed RCC slabs, brick cladding, and a harmonious blend of greenery.

No Image

Waste To Energy Campus / INI Design Studio

January 15, 2024 Hana Abdel 0

Waste management is a global issue with local impact, and reducing waste generation through prevention, reduction, recycling, and reuse is a core concern of the UN. India faces a pressing challenge, with 62 million tonnes of Municipal Solid Waste (MSW) generated annually, only 69% of which is collected and a mere 28% treated, leading to open landfills. Aligned with the Paris Accord, COP 26, and the Swachh Bharat (Clean India) Mission initiated by the Indian Prime Minister, Abellon, a pioneer in India’s Waste-to-Energy (WTE) sector, aimed to process and dispose of 50-100% of the city waste, using controlled combustion technology, without the spread of odor, pathogens, or harmful emissions, which complies with MSW rule 2016 (initiated by Govt of India through Ministry of Environment Forest & Climate Change) and European Emission Norms.

No Image

Metallic Bellows Factory Office / KSM Architecture

November 23, 2023 Hana Abdel 0

The administrative office for the Metallic Bellows factory is located on a site of around 16,000 sqm at Vallam, Sriperumbudur. The proposed office is built to the north of the existing manufacturing factory facing the road. The single-story brick-covered structure has glazed office rooms adjacent to gardens with wide brick paved walkways connecting the various spaces.

No Image

Sanand Factory / Studio Saar

August 10, 2023 Hana Abdel 0

Emerging architecture practice Studio Saar has completed a purpose-built industrial facility for Indian multi-national electronics manufacturer Secure Meters in Sanand, a city in the Indian state of Gujarat famed for automobile manufacture. Secure Sanand has been designed to create an uplifting work environment and promote staff wellbeing while reducing energy consumption and includes state-of-the-art manufacturing facilities, a canteen and recreational hub for staff, a seasonal lake that fluctuates between one to three acres in size to allow for rainwater harvesting and will see an additional 2,000 trees planted on the site.

No Image

Mallcom Factory / IKSOI

June 29, 2023 Hana Abdel 0

Built on an old textile mill compound in Ahmedabad, Mallcom’s new factory is a PPE garment-stitching unit. The design of the unit takes a holistic approach that balances the needs of the manufacturing sector with the social, economic, and environmental realities of current India.

No Image

The Timber Hat Building / rundzwei Architekten

June 20, 2023 Hadir Al Koshta 0

Company headquarters and operating facility in timber construction – In an ordinary industrial park south of Stuttgart, rundzwei Architekten BDA have designed an unusual headquarters and operating facility in timber construction. The translucent, all-round canopy made of carbonized larch wood – the eponymous “wooden hat” – protects against the weather and gives the building its characteristic shape. “When a long-established family business builds anew, things don’t always have to stay the same.” (Architect Marc Dufour-Feronce) Hald & Grunewald specializes in the sale and rental of forklifts, telescopic handlers, work platforms, and container solutions. Training, maintenance, and repairs are also part of the offer. Around 90 employees work at the new main location in Ergenzingen, between Schönbuch, the northern Black Forest, and the Swabian Alb. The aim of the project was to bundle all the company’s functions in one location. At the beginning of the project, the architects analyzed and optimized the existing workflows together with the employees. The aim was to “rethink” the long-established family business, to question old structures, and to create a contemporary commercial building with optimal workflows and quality of space for all user groups.

No Image

Domaine Kurodasho Winery / TOFU Inc.

June 19, 2023 Hana Abdel 0

Domaine is a French word meaning territory or compartment particularly in the historic Burgundy region, world-renowned for its fine wineries, and refers to producers who grow, harvest, ferment, and bottle the wine produced in their own vineyards. In contrast, in Japanese saké production, there has historically been a division of labor between “rice cultivation” and “rice brewing.” It is said that this is due to the development of the class system during the Edo period in which Japanese society was divided into four main groups: the samurai, the farmers and peasants, the artisans, and the merchants. Subsequently, to achieve the goal of creating a product that truly exudes the “terroir” and “vintage” of the Domaine, we inaugurated the construction of rice brewing facilities in 2018, a development that accorded us the means with which to use the rice grown on our own adjacent rice paddies to produce saké. 

No Image

Awaji Factory / OHArchitecture

June 9, 2023 Pilar Caballero 0

“Proliferation and Pleats” – An agitator manufacturing company that systematically relocated its head office and factory to Awajishima in anticipation of the next 300 years. Three years later, it was decided to increase the number of assembly plants to meet an unexpected order for large equipment.

No Image

National Heavy Vehicle Engineering Technology Research Center / CCDI GROUP 21 Design Studio

May 20, 2023 Collin Chen 0

The project’s context – The National Heavy Vehicle Engineering and Technology Research Center is located in the center of Jinan High-tech Zone, adjacent to Hanyu Golden Valley in the north, and close to Shunao Park, with convenient transportation and a good landscape. The project covers an area of 22861 square meters, with a total building area of 145516.21 square meters, a tower curtain wall height of 96m, and a structural roof height of 89.85 meters.